Kitchen renovations · Perth

Kitchen renovations in Perth, without the coordination headache

Cabinetry, benchtops, splashbacks and every bit of the electrical fit-out, from one accountable team.

The problem

Why do so many kitchen renovations run late?

A kitchen is the most trade-heavy room in the house. Cabinet maker, plumber, electrician, tiler, stone mason, plasterer, painter. Each one waits on the one before, and when one slips, they all slip. Meanwhile you're cooking in the laundry.

We run your kitchen as one project with one schedule. Because the electrical is done in-house, there's no waiting for an electrician to fit you in. Powerpoints, appliance circuits and lighting go in exactly when they should.

Black and white kitchen benchtop

What's included

What's included in an RH Construct kitchen

Every trade, scheduled in the right order, and the electrical done by our own licensed team.

  • Layout planning around how you actually cook and entertain
  • Demolition and removal of the old kitchen
  • Custom cabinetry and joinery, including pantries and islands
  • Benchtop and splashback coordination (stone, engineered stone alternatives, tile)
  • Plumbing coordination for sinks, dishwashers and fridges
  • Full kitchen electrical: dedicated appliance circuits, extra powerpoints, USB outlets, rangehood and cooktop connections
  • Lighting: downlights, pendants, under-cabinet and in-cabinet LED strips
  • Plastering, tiling, painting and flooring to finish

One team

Every trade your renovation needs

How a managed renovation works →

  • Tiling
  • Waterproofing
  • Plastering
  • Cabinetry
  • Flooring
  • Painting
  • Electrical
Kitchen renovation with stone benchtop and undermount sink

Why RH Construct

Why Perth homeowners choose RH Construct

  1. One licensed team, not two.

    Full renovation capability plus an in-house electrical contractor's licence. Wiring, lighting and power are done by the same team building your renovation. No separate electrician to chase, and no gaps between trades for mistakes to hide in.

  2. Owner on the tools.

    Khade is on site across every project, not running things from an office. Questions get answered on the spot, problems get caught before they cost you, and the standard stays the same job to job.

  3. We stand behind the work.

    If something isn't right, even months later, we come back and fix it. No paperwork battles and no excuses.

  4. Built for premium Perth homes.

    From Applecross to Canning Vale and across our wider Perth catchment, we deliver work that matches the standard of the homes we work on.

  5. You always know where you stand.

    What's happening, when, and what it costs, before it happens. No chasing updates. No surprise invoices.

How it works

How your renovation runs

See our full process →

  1. Talk to Khade

    Tell us what you want to change and roughly what you want to spend.

  2. Site visit and quote

    We measure up, talk through options and give you a clear, itemised quote.

  3. Lock in your start date

    You know exactly when we start and roughly when we finish.

  4. We build, you stay informed

    One team on site, regular updates, no chasing.

  5. Handover

    A walkthrough, a clean site, and our commitment to come back if anything isn't right.

Our work

See the work in action

FAQ

Kitchen renovation questions

Typical kitchen investment

$5,000 to $40,000+

Depending on the scope of works. Itemised quote after a site visit.

How much does a kitchen renovation cost in Perth?

It depends on size, layout changes and finishes. $5,000 to $40,000+, depending on the scope of works. You get an itemised quote after a site visit, so you can see where the money goes.

Can you move my kitchen layout?

Often, yes. Moving a sink or cooktop means moving plumbing and power. Because we do the electrical ourselves, layout changes are simpler to plan and price.

Do you supply appliances?

You can choose and buy your own, or we can advise. Either way, we plan the circuits and cabinetry around the exact models.

How long will I be without a kitchen?

5 to 10 days on site, depending on the scope of works. We’ll give you the schedule up front and tell you which days you’ll be without water or power.

Still have a question?

Call Khade directly, or send the details and he’ll get back to you personally.

Kitchen benchtop and splashback being installed

Free quote

Tell us about your project

Fill in the form and Khade will be in touch personally, usually within 48 hours. Prefer to talk? Call 0415 612 153.

Sharing a rough budget helps us show you what's genuinely achievable for your space from the very first conversation.

Kitchens are our most requested project and slots fill months ahead. The earlier you're in the queue, the sooner we can start.

No obligation. Your details go to Khade only and are never shared.

Call Khade Get a quote